Skip to content
Certus

Service status

Operational claims should point to a real check.

This static page does not infer availability from its own ability to load. It describes the deployment and liveness signals Certus actually maintains, and states what each one can prove.

Current view

Certus does not publish an unmeasured “all systems operational” banner here, and it does not yet publish a public incident feed. Saying so is more useful than a green light no check stands behind.

Deployment checks

A revision reaches a Certus deployment only after its recorded gates pass: dependency and boundary rules, static typing, the engine and fixture suites, a typecheck, lint and production build of both front ends, and a build of every deployable image. The deploy step then runs post-deploy smoke probes against the released containers.

Those records live in the private deployment pipeline. A passing gate says that one exact revision met those checks at the moment it shipped; it does not promise that a later incident has not occurred.

Liveness endpoints

Inside a deployment, GET /healthz reports that the API process is serving requests. The public webhook ingress exposes GET /_ingress/health, which reports that the proxy itself is reachable without forwarding a request to the engine.

The engine health route is intentionally unavailable on the public webhook ingress. Deployment operators run both probes from their authorized network and treat them as separate signals.

What liveness proves

A liveness response proves that one process or proxy answered at that moment. It does not prove database readiness, model-provider availability, sandbox capacity, or the outcome of a customer run. Those facts remain visible through their own typed failures and deployment telemetry.

Incident help

Enterprise customers should use their named support channel for live incident coordination. Evaluation teams can email sales with the affected deployment and approximate time; do not include credentials or repository content.